GE DS200SDCCG1AGD
1. Key Parameters
|
Parameter
|
Description
|
|---|---|
|
Rated Voltage
|
200 kV (suitable for 110 kV, 132 kV, 150 kV, 220 kV, etc.)
|
|
Rated Frequency
|
50 Hz / 60 Hz
|
|
Communication Interfaces
|
Ethernet (10/100 Mbps, optional 1 Gbps), Optical Fiber (optional 1000BASE‑LX), Serial Port (RS‑232/RS‑485), USB
|
|
Supported Protocols
|
IEC 61850‑9‑2 (GSE), IEC 61850‑7‑4 (MMS), DNP3, Modbus, IEC 60870‑5‑101/104
|
|
Processor
|
High-performance embedded ARM/PowerPC dual-core processor
|
|
Memory/Storage
|
4 GB DDR4 RAM, 128 GB SSD (expandable)
|
|
Operating Temperature
|
-40 °C – +85 °C (Industrial Grade)
|
|
Power Supply
|
100 VDC – 240 VDC (wide-range DC input)
|
|
Dimensions/Weight
|
1U/2U rack-mounted, approximately 4 kg (varies by configuration)
|
|
Redundancy
|
Optional dual-controller redundancy, dual-power redundancy, dual-network redundancy (hot-swappable)
|
|
Security
|
Supports IEC 62351, TLS/SSL encryption, Hardware Security Module (HSM)
|
______________________________________________________________________________________________
2. Product Features
|
Feature
|
Detailed Description
|
|---|---|
|
Fully Digital
|
Replaces traditional analog/electromagnetic relays to achieve fully digital measurement, protection, and control.
|
|
Highly Integrated
|
Integrates protection, monitoring, communication, and logic control functions, supporting rapid configuration of IEC 61850 Logical Nodes (LN).
|
|
Modular Redundancy
|
Supports Hot‑Standby and Dual‑Controller, with extremely low single-point failure rate.
|
|
Fast Response
|
Based on IEC 61850‑9‑2S (Sampled Values) and GOOSE, switching/protection action time can reach millisecond level.
|
|
Safe and Reliable
|
Complies with IEC 62351 network security standards, supporting multiple identity authentication, Access Control List (ACL), and security audit.
|
|
Easy Maintenance
|
Supports remote online diagnosis, firmware OTA upgrade, and Web/SCADA graphical configuration interface.
|
|
Strong Compatibility
|
Backward compatible with traditional relay logic, and can work with IEDs from brands such as GE, ABB, and Siemens.
|
|
Environmental Adaptability
|
Equipped with moisture-proof, dust-proof, and shock-proof design, meeting the requirements of IEC 61850‑9‑2 for Electromagnetic Compatibility (EMC).
|
______________________________________________________________________________________________
3. Structure and Composition
Main Control Unit (Controller)
Power Supply Module
Communication Interface Module
Protection & Measurement IED
Logic & Control IED
Optional Expansion Modules
______________________________________________________________________________________________
5. Installation and Maintenance
5.1 Installation Guide
- On-site Survey: Confirm cabinet space, temperature range, power supply voltage, and grounding conditions.
- Cabinet Installation: Fix in a standard 19-inch cabinet using shockproof gaskets.
-
Wiring:
Power-On and Self-Test: Turn on the power and observe the LED status indicators (Power, Comm, Alarm).
- Power Supply: Connect dual-power input, check polarity and grounding.
- Measurement: Connect CT/VT, calibrate phase and proportional coefficient.
- Communication: Connect to the control room switch via optical fiber or copper cable.
- Configuration: Import logical node configuration using the SCD (Substation Configuration Description) file provided by GE, or manually set via the GUI.
______________________________________________________________________________________________
5.2 Maintenance Points
|
Item
|
Maintenance Content
|
|---|---|
|
Hardware Inspection
|
Regularly check the cooling fan of the power module, the cleanliness of fiber optic connectors, and the grounding resistance.
|
|
Firmware Upgrade
|
Perform OTA upgrade via GE Digital Power Studio or Web UI to ensure compatibility with the latest IEC 61850‑9‑2 standard.
|
|
Log Analysis
|
Regularly export operation logs (Syslog, IED Log) and analyze alarm trends.
|
|
Backup
|
Perform offline backup of configuration files (SCD, SCL) and databases monthly.
|
|
Security Audit
|
Audit user permissions, password policies, and TLS certificate validity quarterly.
|
|
Redundancy Test
|
Simulate power/network faults to verify whether the dual-machine hot-standby switching time meets the requirements (≤ 50 ms).
|
————————————————————————————————-
Main brand
ABB Allen-Bradley Alstom Bently Emerson Foxboro
GE MOOG Schneider Woodward HIMA Honeywel Triconex & more
Contact our professional team today for customized solutions to meet your electrical component needs.
📧 x13806028623@gmail.com / johnedward.zch@gmail.com
📞 +86 18250705533(Whatsapp)丨Sales Manager : Jinny/John




-480x480.jpg)

There are no reviews yet.